Epro 8 Challenge 2 Build a Bridge

Today Room 7 did another Epro 8 challenge to make a bridge that was about 2.5 metres long, 700mm tall, 400mm wide. It took a long time to build this. It’s been really tough this week because we’ve done only two activities, half of our class were already tired, some of the groups had bridges that were really about 2.3 metres long and some had just started doing the bottom.

My group made a lot of upgrades, we weren’t going to use instructions or a video because our teacher wanted us to see how we built this on our own, which I thought was a great idea. Once we were finished we made our own cars to test out the bridge, when we tested out our car it worked out perfectly except for the balance because it was a bit sturdy. The rest of the groups tested their cars on their own bridge which turned out the same way as us. It has been a wonderful weekend Engineering our own buildings.

Leave a Reply

Your email address will not be published. Required fields are marked *